Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Locatie Open Oproep 2021 © Tim Van de Velde

Luchtfoto © GDI-Vlaanderen

Luchtfoto © GDI-Vlaanderen

Project description

N.B.: this Open Call takes place subject to the conclusion of a Preliminary Contract and a final Basic Team Agreement

De Brug primary school for special education belongs to the 19 Dender Flemish Community Education school group. The school, which has around 160 students, provides education for children with slight mental disabilities.

The school is housed on a spacious and green site, located literally in the garden of a small villa in the centre of Erpe, a borough of Erpe-Mere. The school consists of 12 concrete outbuildings from 1970 and 4 portakabins from 1992. The infrastructure is extremely outdated and no longer meets modern standards. Due to the single glazing and poorly isolated walls and roofs, the buildings waste a lot of energy. Furthermore, there are materials present which contain asbestos.

The brief comprises the design of a completely new building on the current site. The new school must bring together all the qualities of a welcoming home in an oasis of tranquillity and green. The school attaches great importance to architecture which fits in well with the surroundings and retains as much open space as possible. Special attention must be devoted to be specific situation of the special-needs children and the school architecture must, as an educational environment, answer the specific pedagogical needs of the children.

The new building must be compact and energy-efficient, but still permit sufficient contact with the outdoor environment.
The programme comprises 20 classrooms, therapy rooms, an administrative unit, a refectory and a multi-purpose hall which can also be used for physical education lessons.

global fee for basic team €91,94 per sq. m. excl. VAT

Please note: In their statement of motivation for each model project for which they apply (maximum of 3), candidates must list reference projects from their portfolio. The following information must be supplied with respect to these reference projects: the client, a description and the cost price of the services and the estimated cost price of the completed project.

Erpe-Mere OO2021

Full design brief for the construction of a new building for the De Brug primary school, Erpe-Mere.

Project status
Selected agencies
  • Architectenbureau Bart Dehaene, Sileghem en Partners, Architecten en Ingenieurs
  • Compagnie O.
  • Geurst & Schulze architecten bv
Location

Koebrugstraat 7, 9420 Erpe-Mere

Timing project
  • Selection: 7 Dec 2010
  • First briefing: 17 Feb 2011
  • Second briefing: 23 Mar 2011
  • Submission: 17 May 2011
  • Jury: 24 May 2011
Client

School Invest

contact Client

Ingrid Van den Heuvel

Contactperson TVB

Annelies Augustyns

Procedure

prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.

External jury member

Els Nulens

Budget

2.894.832 € - 2.507 sq.m (excl. VAT) (excl. Fees)

Awards designers

€7,500 (excluding VAT) per prizewinner