Neder-over-Heembeek - GO Neder-over-Heembeek

Realization
Selection

ABT België nv, RCR raadgevend ingenieursbureau, VBM architecten
Download design proposal
Architects Lahdelma & Mahlamäki
Download design proposal
Ars Horti, Mys & Bomans bvba, UTIL
Download design proposal
Conix Architects cvba
Download design proposalProject description
The site in Neder-over-Heembeek is home to the BuSO, the MPI and the reception centre. The BuSO is currently housed in a series of pavilions scattered over a large area of the site, and the MPI is housed in a permanent two-storey building. The pavilions are in a very poor state and have to be replaced. It is important to note that the work of the school, boarders’ accommodation and reception centre must be able to continue during the building work (including school holidays). This is why the option is to carry out the whole operation in 3 stages: the first stage is the building of new boarders’ accommodation on an unbuilt part of the site, the second is the refitting of the present boarders’ accommodation for the BuSO and the third is the demolition of the existing pavilions and their replacement by a new building. Another important element is the school’s target group: this is special education, which requires a specific approach.
Project details
Project code
OO1314
Official name
Complete study asignment for the replacement of buildings (in 3 stages) for the BuSO, MPI and reception centre in Neder-over-Heembeek.
This project is part of the project bundle OO13.
Status
Realized
Client
Gemeenschapsonderwijs
Site location
Koning Albertlaan 181
1120 Neder-over-Heembeek
Belgium
Timing project
- Selection meeting:
- First briefing:
- Second briefing:
- Deadline offers:
- Jury:
- Award:
Contactperson client
Ferlin Dirk
Award procedure
prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.
External jury member
Karel De Baere
Financial
Construction budget
Including VAT
Including commission
Fee for offers
Project type
Function
Domain
European publication
- Date European publication:
- Number European publication: 16-018449
Publication bulletin
- Date publication bulletin:
- Number publication bulletin: 50169
This project was realized via Open Oproep. Read more about this tool.
Last reviewed on: .