Moerbeke - Master-plan

Realization
Selection

PLUS office architects, Voorland
Download design proposal
Studio Paola Viganò
Download design proposalProject description
Moerbeke local authority wants to have a master-plan drawn up for the village centre (in the broadest sense). It will present a concept for the short, medium and long term, paying attention to both the potential and the pressure points in every aspect of the borough. These elements include business, transport, public space, greenery, tourism, housing, parking, public buildings etc. The aim is to create a village centre that forms a single entity with its own clear style. Public elements must be connected both functionally and visually so that in the long term a hip, convivial, lively, green, practical and restful centre with safe traffic can be developed that encourages business ventures. Important points of focus in this regard are the recent developments in the local area: the building of a new school/multipurpose hall, and the master-plan for the site of the sugar factory and the sports site. What is in fact desired is a SWOT analysis of the borough, including concrete phased policy recommendations for the future.
Once the master-plan has been handed over, the principal may decide to award part or all of the assignments for its execution to the design team, but is not obliged to do so. He may also decide to award the subsequent assignments to third parties, following a new tendering process. In this case, the creator of the master-plan will be given the task of quality supervisor.
Project details
Project code
OO3407
Official name
All-inclusive design assignment for a master-plan for the centre of Moerbeke
This project is part of the project bundle OO34.
Status
Realized
Client
Gemeentebestuur Moerbeke
Site location
Markt 1
9180 Moerbeke
Belgium
Moerbeke centre
Timing project
- Selection meeting:
- First briefing:
- Second briefing:
- Deadline offers:
- Jury:
Contactperson client
Barbara Put
Contact Team Vlaams Bouwmeester
Christa Dewachter
Award procedure
Design contest followed by a negotiated procedure without publication of a contract notice
External jury member
Bart Biermans
Financial
Commission
Fee for offers
Project type
Domain
European publication
- Date European publication:
- Number European publication: 2017/S 129-264218
Publication bulletin
- Date publication bulletin:
- Number publication bulletin: 524892
This project was realized via Open Oproep. Read more about this tool.
Last reviewed on: .