Sint-Martens-Latem - Library

Open Oproep OO3204 Realized

Realisatie Open Oproep 3204 © Kaat Somers

Selection

Cristina Díaz Moreno & Efrén García Grinda

Download design proposal

Havana architectuur

Download design proposal

Project description

Sint-Martens-Latem, south of the city of Ghent, is characterised by its location on the River Lys and its green environment. It has leafy lanes, many unmetalled, and fine, large and in some cases built by renowned architects, private houses. By acquiring strategically located sites, the local authority aims for the conservation and, where necessary, restoration of the district’s green qualities.

Partly because of its artistic history, Sint-Martens-Latem is also seen as a cultural borough (see historical artists like Fritz Van den Berghe, Gust De Smet, Georges Minne and others). This is apparent from, among other things, its three museums, but also from the local cultural prizes for poetry, choral music and photography, and its various socio-cultural clubs and activities.

The local heritage is on a rather small-scale and is spread over the whole district, which gives it a fine-grained texture. The local council is particularly concerned with the DNA of the district and, as an area outside the city, aims to retain a character distinct from the neighbouring towns of Ghent and Deinze.

The public library plays an increasingly prominent part in the cultural life of the district. It is not only a place where one can borrow books: you also find audiovisual media there. In addition, the library itself organises various activities such as the youth book week, readings by authors for children and adults, class visits, support to reading clubs and IT workshops, and also engages in other activities run by the local cultural department. The library is more than a depository of books. It is a true meeting place for the local community.

However, the library infrastructure has not developed in parallel with these activities and has to be updated in order to meet the needs of visitors, staff and its activities. The present library building is on a site that also accommodates the local primary school. This school also houses an annex of the Academy of Word, Music and Dance in the town of Deinze, which uses the accommodation outside the normal school hours.

It is not only important that the new library meets the needs of its contemporary operations, but it should also be integrated as much as possible into the other functions fulfilled on this site for ‘lifelong learning’. Considering the limited space available, it is important to endeavour to establish synergies between the various activities.

Project details

Project code

OO3204

Official name

All-inclusive design assignment for the construction of a library in Sint-Martens-Latem.

This project is part of the project bundle OO32.

Status

Realized

Client

Gemeentebestuur Sint-Martens-Latem

Site location

Latemstraat 80
9830 Sint-Martens-Latem
Belgium

Timing project

  • Selection meeting:
  • First briefing:
  • Second briefing:
  • Deadline offers:
  • Jury:

Contactperson client

Jef Van den Heede

Contact Team Vlaams Bouwmeester

Christa Dewachter

Award procedure

Design contest followed by a negotiated procedure without publication of a contract notice

Financial

Construction budget

Library: €1.350.000, surroundings: €150.000,00

Excluding VAT

Excluding commission

Commission

Architecture, Stability and Technical installations: 11,00 % - 12,50 % of the total cost of constructing the building. Layout of surroundings: 7,50 %- 9,50 % of the total cost of laying out the open space.

Fee for offers

€8.500 excl VAT / 4 candidates

Project type

European publication

  • Date European publication:
  • Number European publication: 2016/S 135-243749

Publication bulletin

  • Date publication bulletin:
  • Number publication bulletin: 2016-521497

This project was realized via Open Oproep. Read more about this tool.