Schaarbeek - De Muziekladder primary school

Realization
Selection

Bart Macken Eef Boeckx Partnership
Download design proposalCollectief Noord
Download design proposal
Puls architecten
Download design proposal
Urban Platform
Project description
In Brussels there is a shortage of places in Dutch-language primary education. To respond to this capacity issue, the Flemish Community’s GO! education network and the Brussels school group wants to establish a new primary school in Schaarbeek with support from the Flemish Community Commission. This school, De Muziekladder, should provide 180 places for pupils in the kindergarten and primary school.
The plan is to build the school on the domain of the music school in Lambermontstraat in Schaarbeek.
The GO! owns a large enclosed domain with plots along Lambermontstraat, Jan Blockxstraat and Helmetse Steenweg. The inner area is entirely a park zone. Building is possible along the street sides, within the profiles of the adjacent houses.
The music school is in Lambermontstraat and temporary units have been installed on Helmetse Steenweg so that the new school can already be started up on 1 September.
The largest area for building is in Jan Blockxstraat. This is where the new building should be, but this area is not big enough to accommodate the entire school. So the kindergarten children will be housed on Helmetse Steenweg. Building will have to be in two stages. The first is the primary school. When it is finished the temporary units on Helmetse Steenweg can be removed and a new building for the kindergarten can be put up.
This is a typical urban setting. The building area is limited and the profiles of the adjacent terraced houses will have to be adhered to. So several storeys will be needed.
The programme includes the functions that are indispensable for the operation of a primary school: classrooms, dining room, multipurpose hall, offices, etc.
GO! education aims for sustainable school buildings. Sustainable in every sense: location, mobility, energy, water, building process, materials, safety and comfort. For this purpose, the GO! education system has developed a sustainability meter together with Agion. The design of the building must at every stage be checked against this sustainability meter.
all-inclusive fee of 7.33% (incl. stability, technical installations, EPB,etc.)
Project details
Project code
OO2212
Official name
All-inclusive architecture assignment for a new primary school in Schaarbeek.
This project is part of the project bundle OO22.
Status
Realized
Client
G-O! onderwijs van de Vlaamse Gemeenschap
Site location
Jan Blockxstraat 23
1030 Schaarbeek
Belgium
Timing project
- Selection meeting:
- First briefing:
- Second briefing:
- Deadline offers:
- Jury:
Contact Team Vlaams Bouwmeester
Annelies Augustyns
Award procedure
prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.
External jury member
Niklaas Deboutte
Financial
Construction budget
Excluding VAT
Excluding commission
Fee for offers
Project type
Function
Domain
European publication
- Date European publication:
- Number European publication: 2011/S 131-217657
Publication bulletin
- Date publication bulletin:
- Number publication bulletin: 2011-514757
This project was realized via Open Oproep. Read more about this tool.
Last reviewed on: .