Vilvoorde - Primary School Klim Op

Realization
Selection

DEWIL architecten
Download design proposal
Kathy Vanhulle, MULTIPLE architecture & urbanism
Download design proposalProject description
The school belongs to Flemish Community Education school group 3. The ‘Klim Op’ primary school is located in K. Ledeganckstraat in Vilvoorde and includes both a nursery school with 174 infants and a primary school with 367 pupils.
The school is currently struggling with a number serious problems regarding its rooms: either they have not been adapted or they are temporary and still too few in number. For example, the dining room is far too small and lunch also has to be eaten at four other locations in the school which are not really suitable. There are also four container classrooms in use for which only temporary permission was given. All recesses and storage spaces have been converted into classrooms which are far too cramped.
The project therefore comprises:
a new building:
- a ground floor with a dining room for 500 pupils and a kitchen (for heating up food)
- also on the ground floor: storage spaces and sanitary facilities for boys and girls
- a floor with 9 classrooms, storage space and sanitary facilities
a conversion:
- the building which currently contains the dining room, kitchen and sanitary facilities must be converted into administrative offices, a daycare room/sick bay and a staff room.
The new building can be located on the ‘sports field’ in Hendrik I-lei. A covered connection between the new building and the existing nursery school building would immediately remedy the lack of a covered play area for infants.
Please note: In their statement of motivation for each model project for which they apply three candidates must list reference projects from their portfolio. The following information must be supplied with respect to these reference projects: the client, a description and the cost price of the services and the estimated cost price of the completed project.
Overall fee core team 87,88 €/sq.m excluding VAT
Project details
Project code
OO1924
Official name
Integrated architecture assignment for the construction of a new building for the Klim Op primary school in Vilvoorde.
This project is part of the project bundle OO19.
Status
Realized
Client
School Invest
Site location
Ledeganckstraat 16
1800 Vilvoorde
Belgium
Timing project
- Selection meeting:
- First briefing:
- Second briefing:
- Deadline offers:
- Jury:
Contactperson client
Lieve Denaeyer
Contact Team Vlaams Bouwmeester
Annelies Augustyns
Award procedure
prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.
External jury member
Geert Driesen
Financial
Construction budget
Excluding VAT
Excluding commission
Fee for offers
Project type
Function
Domain
European publication
- Date European publication:
- Number European publication: 13-016840
Publication bulletin
- Date publication bulletin:
- Number publication bulletin: 000928 p.1253
This project was realized via Open Oproep. Read more about this tool.
Last reviewed on: .