Antwerpen - Antwerp Coordination Centre, Antwerp Harbour

Open Oproep OO1701 Being built

OO1701 Visiebeeld © Neutelings Riedijk Architecten BV

Selection

Arcadis Belgium nv, evr-Architecten

Download design proposal

Baumschlager Eberle Architekten

Download design proposal

Van Berkel & Bos UNStudio bv.

Download design proposal

Project description

The ever increasing density of shipping, the increase in the size of ships and the number of ships calling at the port of Antwerp, especially after the further deepening of the Westerschelde, make it vital, with regard to the smooth handling and safety of shipping, that the principles of the chain approach should be implemented. To this end it is essential that all the parties involved in the supervision of shipping are assembled in a single workplace. The intention is also to expand this platform into a crisis centre for the Antwerp harbour area.

The existing building at the Zandvlietsluis – block A on the enclosed plan – no longer complies with current requirements regarding fire safety, hygiene and general comfort and will therefore be demolished after the establishment of the new ACC. The maintenance of certain crucial services can only be assured by means of this phased approach. The demolition of block A is part of the brief.

The remaining three buildings – marked as B, C and D on the plan – are to be retained.

In the first place, there is the decisive functional requirement that there be ‘as much visual contact as possible’ with the ships sailing in and out. Because of various nautical restrictions, the shipping on the River Scheldt itself, above all, and also that in the Kanaaldok, and especially the very large ships sailing in and out of the Deurganckdok (and future Saeftinghedok) must be supervised very closely, and visual contact is indispensable in this regard. By erecting a control tower with a height of 60 to 80 metres (to be decided by additional studies), a clear view is created over the surrounding infrastructure and industrial obstacles.
The ACC will provide room for about 60 employees. The necessary social accommodation must be provided, since several services work round the clock (in three shifts). There must also be an extensive data centre and high-technology crisis centre with a visitor’s room.

The new control tower should improve the visual quality of the site, should be a significant landmark in the maritime landscape and should enter into dialogue with the various industrial sites and the wind farm. The brief includes the necessary study into integration and the overall approach to the project site and its implementation.

The concept should comply with the practical and functional demands of the various services accommodated together here.

In addition, great importance is attached to the sustainability of the building and its materials. It goes without saying that low-energy construction is also required. A feasibility study into alternative energy systems is part of the brief. And the design team should put these items to the fore.

Fee basis: 

overall fee of 10%, with a maximum of 2% additionally (max. 12%) (architecture, stability, climate and utilities, landscaping)

Project details

Project code

OO1701

Official name

Full design brief for the establishment of a centre for shipping supervision and a crisis centre for the Port of Antwerp, hereafter referred to as the Antwerp Coordination Centre (ACC)

This project is part of the project bundle OO17.

Status

Being built

Client

VO, MOW, Agentschap voor Maritieme Dienstverlening

Site location

Potpolderweg zn
2040 Antwerpen
Belgium

Lock platform between Zandvlietsluis and Berendrechtsluis

Timing project

  • Selection meeting:
  • First briefing:
  • Second briefing:
  • Deadline offers:
  • Jury:
  • Award:
  • Assignment of designers:
  • Assignment of executers:

Contactperson client

Carlo Jansen

Award procedure

prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.

External jury member

Floris Alkemade

Financial

Construction budget

€11,000,000

Excluding VAT

Excluding commission

Fee for offers

€20,000 (excl. VAT) per prizewinner

Project type

European publication

  • Date European publication:
  • Number European publication: 12-016788

Publication bulletin

  • Date publication bulletin:
  • Number publication bulletin: 000832

This project was realized via Open Oproep. Read more about this tool.

Last reviewed on: .

Top