Borgerhout - Waterbouwkundig labo Borgerhout

Open Oproep OO1209 Realized

Beeld masterplan © Ars Horti, Mys & Bomans bvba, UTIL

Selection

ABSCIS ARCHITECTEN

Download design proposal

architecten BOB361 architectes

Download design proposal

OMGEVING

Project description

This is not the first time the Hydraulic Research Laboratory has expressed its need of an auditorium, restaurant,
additional office space, laboratory, storage space, etc. Several of these facilities are currently located in
buildings that were built on the site 30 years ago and were clearly meant to be temporary structures. These
spaces have not been adapted to comply with contemporary expectations.
Furthermore, the site contains a number of large halls, which at the time were built to house all kinds of scale
models and experiments. Of course, working methods have changed radically in recent Decades, but the halls
could be put to other uses.
The site also houses other administrative bodies (VIOE, VMM) that have very specific needs (office space with
laboratory facilities). The idea is to examine whether the site can offer solutions for all these questions, and to
translate those solutions into projects.
The client explicitly reserves the right, under existing regulations, to award the implementation studies
contained in the Master Plan, in full or in part, to third parties other than the designer / design team. In such an
event, the designer / design team has no right to claim compensation. For any studies awarded to third parties
within this context, however, the designer / design team will be given a supervisory role.

Project details

Project code

OO1209

Official name

Comprehensive commission for a study for drawing up and potentially implementing a master
plan, as well as supervising the subcontracts allocated to third parties, for the site of the
Hydraulic Research Laboratory in Borgerhout.

This project is part of the project bundle OO12.

Status

Realized

Client

VO, BZ, Agentschap voor facilitair Management, Afdeling Gebouwen

Site location

Berchemlei 115
2140 Borgerhout
Belgium

Timing project

  • Selection meeting:
  • First briefing:
  • Second briefing:
  • Deadline offers:
  • Jury:
  • Assignment of designers:

Award procedure

prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.

External jury member

Jo Lefebure

Project type

European publication

  • Date European publication:
  • Number European publication: 133-142820

Publication bulletin

  • Date publication bulletin:
  • Number publication bulletin: 9486

This project was realized via Open Oproep. Read more about this tool.

Last reviewed on: .

Top