Melle - School

Realization
Award

Petillon Ceuppens architecten, Schenk Hattori AA, Thomas De Geeter Architektur GmbH
Download design proposalSelection

Compagnie O.
Download design proposal
META architectuurbureau bvba
Download design proposalProject description
The municipal primary school is currently housed in antiquated buildings alongside the busy N9 road in Melle. The local authority wants to relocate the school to a nearby school site that will soon be vacated. This future site (Vossenstraat-Beekstraat-Spoorlaan) is very spacious and is in a residential area close to the village centre. All the existing school buildings will be demolished, except for the sports hall, which will be renovated. There are numerous standard trees on the site as well as a plot of grass. The local authority wants to build a compact and functional new school for 350 children on the site, on a scale suited to all its users (children, staff and parents), with nursery classrooms, primary school classrooms, rooms for individual guidance and care consultation, a computer room, classrooms for the different religions, a staff meeting room, dining room, kitchen, playroom for infants, toilets, storerooms and technical rooms. In addition, the local authority wants the school to provide before- and after-school care, holiday care, facilities for a music school and community school, outdoor play areas, functional green zones, bicycle storage, pedestrian and bicycle access and a visitor’s car park on the periphery. In addition to the school, the site will also hold a gymnasium linked to the existing sports hall and a crèche, possibly in combination with small-scale housing. These latter buildings are not part of the architectural brief. The local authority has commissioned the Veneco inter-municipal company to draw up a master-plan for the whole site. Together with the project definition, this master-plan will form the framework within which the architects can design the school. The sum to be invested (for study and construction) is 6,000,000 euro including VAT. The overall fee (including stability and technical installations) is set at between min. 8.05% and max. 11%.
Project details
Project code
OO3302
Official name
All-inclusive study assignment for a new building for a nursery and primary school on the Vossenstraat-Beekstraat-Spoorlaan site in Melle
This project is part of the project bundle OO33.
Status
Realized
Client
Gemeentebestuur Melle
Site location
Beekstraat 38
9090 Melle
Belgium
De project area is located between Vossenstraat – Beekstraat – Spoorlaan
Timing project
- Selection meeting:
- First briefing:
- Second briefing:
- Deadline offers:
- Jury:
- Assignment of designers:
- Assignment of executers:
- Realization:
Contactperson client
Rien Gellynck
Contact Team Vlaams Bouwmeester
Anne Malliet
Award procedure
Design contest followed by a negotiated procedure without publication of a contract notice
External jury member
Guy Chatel
Financial
Construction budget
Including VAT
Including commission
Commission
Fee for offers
Project type
Function
Domain
European publication
- Date European publication:
- Number European publication: 2017/S 012-018947
Publication bulletin
- Date publication bulletin:
- Number publication bulletin: 2017-501075
This project was realized via Open Oproep. Read more about this tool.
Last reviewed on: .