Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Locatie Open Oproep 1605 © Michael De Lausnay

Luchtfoto © GDI-Vlaanderen

Luchtfoto © GDI-Vlaanderen

Project description

The police area for Bonheiden, Duffel, Sint-Katelijne-Waver, Putte (known as Bodukap) has bought part of the former 'Hagelstein' monastery in Onze-Lieve-Vrouw- Waver with the aim of providing accommodation for its services there. This purchase was partly prompted by the central location of the property in the overall Bodukap police area. Loo­king further ahead into the future, as a result of the completion of the ring road round Mechelen, it will be possible to plan a virtually direct connection to the ring road at the nearby roundabout. This will improve access within the Bodukap operating area. The whole complex within the Hagelstein grounds includes the monastery section with adjoining grounds (now sold for the purpose of the Bodukap project), a public church building that is linked to the monastery building and a secondary school with sports grounds. The aim is to develop the three functions, i.e. the police centre, church and school func­tions, as independent entities. For the Bodukap project, the client's aim is to enhance the architectonic quality of the monastery building within the complex as much as possible and to have it function as in conjunction with the independent operations of the various surrounding entities. The available section of the monastery complex has a net surface area of approximately
1600 m²; (consisting of a cellar 287 m² (gross 330 m²), ground floor 380 m² (gross incl. internal walls 437 m²), first floor net 350 m² (gross 403 m²), second floor net 289 m²
(gross 333m²) and attic space net 294 m² (gross 330 m²), The total area of the project to be developed is a maximum of 4,272.5 m² (+ logistics complex 729 m²) taking account of
the mainly unofficial calculations.
Only the first part of this maximum development is provided for in the first scenario for the call for tenders. For this reason, the planning vision of the total project is divided into three scenarios.
The first scenario encompasses an architectural proposal of a programme which, ta­king into account the maximum occupancy of the current building, includes a minimum amount of constructions. This phase has to be able to function as an independent and
fully-fledged complex. This means that this phase must be included as a completed unit within the overall complex and will need to operate as a fully functional for the Bodu­kap police area for the years to come. As a guideline for the expansion, it can be stated that a maximum extension of 900 m² (including special security services, etc.) would be permitted. In this scenario the maximum level of usefulness would be wanted from the attic and cellar area, calculated as a function of the cost of making them operating areas or merely as storage space. In this scenario the infrastructure will be used for certain
functions at other locations (armoury, fitness, sports hall, etc.). 
The second scenario features the expansion of a number of services already partly co­vered in scenario 1. This mainly includes the expansion of the police work area, which in conjunction with scenario 1, needs to be accommodated as a continuous unit.
Scenario 3 proposes an overall master plan in which a number of functions provided for in other locations in the previous scenarios (e.g. armoury, fitness, sports hall, etc.) would also be included in the 'Hagelstein' location. For this phase, the expansion of the logistics complex would also be considered.

Sint-Katelijne-Waver OO1605

The complete study and design assignment for the building of a new police station for the Bonheiden police area.

Project status
Selected agencies
  • Architectenbureau Praet-Verlinden
  • dmvA architecten
  • DRIESEN-MEERSMAN-THOMAES architecten cvba
  • guerrilla office architects
  • Hans Verstuyft architecten bvba
Location

Berlaarbaan 227, 2860 Sint-Katelijne-Waver

Timing project
  • Selection: 7 Oct 2008
  • First briefing: 4 Nov 2008
  • Second briefing: 9 Dec 2008
  • Submission: 27 Feb 2008
  • Jury: 10 Mar 2009
  • Award: 25 Mar 2009
Client

Politiezone BODUKAP

Procedure

prijsvraag voor ontwerpen met gunning via onderhandelingsprocedure zonder bekendmaking.

External jury member

Rob Cuyvers

Budget

4.454.750 € (excl. VAT) (excl. Fees)

Awards designers

12,500 EUR excl. BTW per tendering party